Warnock Hersey Wood Stove Installation Manual: A Comprehensive Guide

When it comes to heating your home efficiently and with a touch of rustic charm, a wood-burning stove can be an excellent choice. The Warnock Hersey wood stove, known for its quality and durability, is a popular option for homeowners. This article serves as a comprehensive guide to the installation of a Warnock Hersey wood stove. Whether you’re a seasoned DIY enthusiast or a novice looking to save on heating costs, we’ll provide clear and concise technical details for a successful installation.

Tools and Materials You’ll Need

Before diving into the installation process, ensure you have the following tools and materials at your disposal:

Tools:

  1. Screwdriver
  2. Adjustable wrench
  3. Level
  4. Tape measure
  5. Drill with masonry bit
  6. Chimney brush and rods
  7. Pipe crimper
  8. Hole saw

Materials:

  1. Warnock Hersey wood stove
  2. Stovepipe
  3. Chimney liner (if not already in place)
  4. Heat-resistant sealant
  5. Wall thimble
  6. Non-combustible hearth pad
  7. Insulated pipe
  8. Wall and ceiling supports

Installation Steps

Step 1: Safety First

Before starting the installation, make sure to read and understand the manufacturer’s guidelines and local building codes. Ensure that your chosen location for the wood stove complies with the required clearances from combustible materials.

Step 2: Positioning

Select a suitable location for your wood stove. It should be placed on a non-combustible surface, like a hearth pad, to prevent heat damage to the floor. The stove should also be positioned at least 36 inches away from any combustible walls.

Step 3: Assemble the Stovepipe

Assemble the stovepipe sections and attach them to the stove’s flue collar. Use the provided screws to secure the connection. Ensure that the stovepipe rises vertically and doesn’t have horizontal sections that can trap creosote.

Step 4: Install a Wall Thimble

If your installation requires the stovepipe to pass through a wall, use a wall thimble. This will protect the wall from heat and ensure a safe passage for the pipe. Follow the manufacturer’s instructions for mounting the wall thimble securely.

Step 5: Install Chimney Liner

If you don’t already have a chimney liner in place, you’ll need to install one. The liner ensures proper drafting and prevents the risk of fire in the chimney. Attach the liner to the top of the stovepipe and feed it up through the chimney.

Step 6: Secure the Chimney

Ensure that your chimney is securely supported as it passes through the roof and extends above it. You may need wall and ceiling supports, especially if the chimney extends more than five feet above the roofline.

Step 7: Seal Joints

Use heat-resistant sealant to secure all joints in the stovepipe and chimney liner. This helps prevent leaks and ensures that smoke and fumes are safely directed outside.

Step 8: Final Adjustments

Level the stove using a level to ensure it’s standing straight. You can adjust the stove’s legs if needed. Tighten all bolts and screws to ensure stability.

Step 9: First Fire

Once everything is in place and sealed, it’s time to light the first fire in your Warnock Hersey wood stove. Start with small, controlled fires to cure the paint and break in the stove gradually.

Conclusion

Installing a Warnock Hersey wood stove can be a rewarding and cost-effective way to heat your home. However, it’s crucial to follow the manufacturer’s instructions and local building codes to ensure a safe and efficient installation. By adhering to the technical details outlined in this guide, you can enjoy the warmth and ambiance of a wood-burning stove while maintaining the safety of your home.

Leave a Reply

Your email address will not be published. Required fields are marked *